top of page


Gulf Shores & Orange Beach
Condo and property guides for the Alabama coast.


Orange Beach’s SR‑161 Roundabout Is Open—But the Project Is Still Nearing Completion
The SR-161 North Roundabout is open south of Gateway Boulevard, and officials say the broader improvement project is nearing completion. Buyers should test the new connections in person.
Ryan Pritchard
1 hour ago3 min read


Gulf Shores’ Development-Application Pause: Which Land Plans Need a Timing Check
Gulf Shores temporarily paused acceptance of several development-application types while its new comprehensive plan proceeds. Here is how land buyers can identify timing risk without treating the pause as a permanent zoning change.
Ryan Pritchard
1 day ago3 min read


Pensacola’s Monteigne Drive Force-Main Replacement: What Nearby Owners Should Document Before January
An emergency force-main replacement is active along Monteigne Drive and Summit Boulevard. Nearby owners should preserve access and condition records.
Ryan Pritchard
2 days ago2 min read


Orange Beach’s Waterfront Park Living Shoreline: A Coastal Ownership Lesson Beyond the Project
Orange Beach says phase one is fully permitted and phase two may follow. The project is also a useful reminder that bayfront ownership requires shoreline, access and maintenance due diligence.
Ryan Pritchard
3 days ago2 min read


Gulf Shores Street Resurfacing Is Underway: Separate Today’s Work From Phase II Plans
Gulf Shores began a multi-street resurfacing project on October 20, 2026. Here is how owners and buyers can separate funded paving from conditional streets and an unscheduled Phase II.
Ryan Pritchard
4 days ago3 min read
Pensacola Beach Condo Buyers: A Milestone Inspection and SIRS Answer Different Questions
Florida treats milestone inspections and Structural Integrity Reserve Studies as separate requirements. Pensacola-area condo buyers should read both records and connect them to budgets, repairs and assessments.
Ryan Pritchard
5 days ago2 min read
Perdido Key Dune Walkovers: Why Beach Access Still Needs a Permit Plan
Private beach access does not make a Perdido Key dune walkover permit-free. Buyers should review the CCCL, dune conditions, design limits and maintenance responsibility before valuing access improvements.
Ryan Pritchard
6 days ago2 min read


Gulf Shores Land-Disturbance Permits Can Expire After 180 Days—Plan Site Work Before Closing
Gulf Shores’ zoning ordinance gives building and land-disturbance permits a 180-day commencement and inactivity clock. Buyers should align permits, contractors and closing.
Ryan Pritchard
Nov 152 min read


Orange Beach Medical Center South Is Under Construction: What Nearby Property Users Should Track
Orange Beach has awarded a $1.4 million renovation contract for Medical Center South. Work began in October, with a nine-month target subject to construction conditions.
Ryan Pritchard
Nov 142 min read


Pensacola’s Berth 6 Assessment Is in Procurement: A Real Estate Guide to Port-Adjacent Due Diligence
Pensacola is selecting a firm for a Berth 6 structural condition and sustainability assessment. The process is underway, but it is not a completed repair project.
Ryan Pritchard
Nov 132 min read


Orange Beach Waterfront Park Living Shoreline: What the Three Phases Mean
Orange Beach’s Wolf Bay living-shoreline project has one permitted phase underway and later phases planned. Here is the real estate context.
Ryan Pritchard
Nov 122 min read


Pensacola's West Main Street Project: Funded Construction Is Not Finished Construction
Pensacola says West Main Street design is complete and trail construction is funded for fiscal year 2026–27. Buyers should distinguish funding, bidding and construction from a finished corridor.
Ryan Pritchard
Nov 112 min read


Orange Beach Waterfront Park Living Shoreline: Phase One Is Permitted and Starting
Orange Beach says the first living-shoreline phase at Waterfront Park is fully permitted and scheduled to start in October 2026. Here is how to read the phased plan.
Ryan Pritchard
Nov 102 min read


Dunwoody Park Groundbreaking Is November 14: What Cordova Park Buyers Should Watch
Pensacola has scheduled a November 14, 2026 groundbreaking for Dunwoody Park improvements. Here is how nearby buyers and owners can evaluate the project without overreading it.
Ryan Pritchard
Nov 92 min read


Gulf Shores Vacation Rentals: License, Local Contact and Tax Duties Follow the Property
A Gulf Shores condo and home buyer guide to rental licenses, renewal dates, local contacts, safety reviews and lodging-tax responsibility.
Ryan Pritchard
Nov 82 min read


Perdido Key Beach Mouse Permits: A Parcel-Level Due-Diligence Guide
Some Perdido Key parcels need Habitat Conservation Plan coverage before a building permit. Learn what to verify about habitat, lighting and recorded restrictions.
Ryan Pritchard
Nov 73 min read


Pensacola Veterans Day Ceremony: Test Downtown and Bayfront Access on November 11
Pensacola’s Veterans Day ceremony begins at 11 a.m. on November 11, 2026 at Veterans Memorial Park. The event offers a useful real-world test of downtown and bayfront access, parking and neighborhood routines.
Ryan Pritchard
Nov 62 min read


Bear Point Stormwater Plan: What Orange Beach Buyers Should Ask
Orange Beach has published the Bear Point Drainage Basin Study and Stormwater Master Plan. The study identifies concerns and recommended projects, but buyers should separate planning from funded construction.
Ryan Pritchard
Nov 52 min read


Gulf Shores Waterway Village Has Three Timelines—Know Which One You’re Buying Near
Waterway Village includes completed design work, an active pedestrian bridge and a later phase that remains unscheduled—three statuses buyers should not combine.
Ryan Pritchard
Nov 42 min read


Pensacola Paused Full One-Stop Review for November: Schedule Development Due Diligence
Pensacola’s November 2026 review schedule and lot-grading threshold can affect feasibility planning for commercial, land and redevelopment projects.
Ryan Pritchard
Nov 32 min read
bottom of page