top of page


Commercial
Commercial real estate guidance across LA, MS, AL, FL and AR.


Gulf Shores’ Development-Application Pause: Which Land Plans Need a Timing Check
Gulf Shores temporarily paused acceptance of several development-application types while its new comprehensive plan proceeds. Here is how land buyers can identify timing risk without treating the pause as a permanent zoning change.
Ryan Pritchard
2 hours ago3 min read


Scotlandville’s 100-Day Initiative Is Underway: What Property Owners Should Document
Baton Rouge has launched a concentrated neighborhood-improvement phase in five Scotlandville-area communities. Here is what buyers, sellers, landlords, and nearby businesses should document while work is underway.
Ryan Pritchard
2 hours ago3 min read


East Feliciana’s Nuclear-Campus Discussion Is Not a Site Approval
East Feliciana has discussed supporting a proposed Nuclear Lifecycle Innovation Campus, but no local site has been approved. Landowners and buyers should separate state negotiations, local resolutions, site selection, permitting, and construction.
Ryan Pritchard
2 hours ago3 min read


Gonzales’ December 12 Christmas Market Is a One-Day Commercial Location Test
The December 12 Christmas Market with Santa will bring 125 listed vendors to Chatagnier Community Market. Commercial buyers and tenants can use the event to observe access and operations—without mistaking one busy day for normal demand.
Ryan Pritchard
2 hours ago2 min read


Pensacola’s Monteigne Drive Force-Main Replacement: What Nearby Owners Should Document Before January
An emergency force-main replacement is active along Monteigne Drive and Summit Boulevard. Nearby owners should preserve access and condition records.
Ryan Pritchard
1 day ago2 min read


East Feliciana’s Solar-Farm Ordinance Adds a Local Due-Diligence Layer for Large Tracts
East Feliciana adopted Solar Energy/Solar Farm Permitting Ordinance 12-87 on June 1, 2026, adding local road, setback, screening and bond considerations.
Ryan Pritchard
1 day ago2 min read


Baton Rouge’s Next 12 Months of Road Bids: What Commercial Property Owners Should Watch
MOVEBR’s November 2026 outlook separates projects nearing advertisement from contracts already awarded—and gives commercial owners a better way to investigate access, visibility and construction timing.
Ryan Pritchard
2 days ago2 min read


West Feliciana’s HUT 8 Water Agreement: Document the Upgrade Without Overpromising the Reach
West Feliciana Parish documents more than $16 million in water infrastructure tied to the HUT 8 facility. Buyers should separate that agreement from property-specific capacity, connection and timing.
Ryan Pritchard
2 days ago2 min read


Livingston Parish’s 2026 UDC Makes Zoning a First-Step Land Check
Livingston Parish adopted a zoning map in 2025 and a Unified Development Code in July 2026. Buyers should confirm zoning, setbacks and approvals before clearing or designing a project.
Ryan Pritchard
3 days ago3 min read


Gulf Shores Street Resurfacing Is Underway: Separate Today’s Work From Phase II Plans
Gulf Shores began a multi-street resurfacing project on October 20, 2026. Here is how owners and buyers can separate funded paving from conditional streets and an unscheduled Phase II.
Ryan Pritchard
3 days ago3 min read


Ascension’s Regional Sewer Project Has Broken Ground: What Buyers Should Track Through 2029
Ascension Parish’s regional wastewater project is under construction, with phased work expected through 2029. Buyers should verify the current system, connection timing and parcel-level obligations.
Ryan Pritchard
3 days ago3 min read
Ascension Parish Commercial Permits: Get the LDH Approval Letter Into the Deal Timeline
Ascension Parish says every commercial applicant must submit a Louisiana Department of Health approval letter before permit approval. Tenants and buyers should plan that review before setting an opening date.
Ryan Pritchard
4 days ago2 min read
Christmas in the Country Runs December 4–6: A St. Francisville Property Field Test
St. Francisville’s Christmas in the Country is scheduled for December 4–6, 2026. Event weekend gives buyers and business users a useful—but unusually busy—look at downtown access and operations.
Ryan Pritchard
4 days ago2 min read
Ascension Parish Storefront Signs: What a Commercial Lease Should Settle Before Installation
Ascension Parish’s sign application calls for engineered plans. Commercial tenants and owners should settle sign rights, approvals and restoration duties before treating signage as a simple opening expense.
Ryan Pritchard
5 days ago2 min read
St. Francisville Historic District Projects: Plan for the Certificate of Appropriateness First
Exterior changes in St. Francisville’s historic district can require a Certificate of Appropriateness before a building permit. Buyers and owners should build the review calendar into renovation plans.
Ryan Pritchard
5 days ago2 min read


Gulf Shores Land-Disturbance Permits Can Expire After 180 Days—Plan Site Work Before Closing
Gulf Shores’ zoning ordinance gives building and land-disturbance permits a 180-day commencement and inactivity clock. Buyers should align permits, contractors and closing.
Ryan Pritchard
6 days ago2 min read


East Feliciana Power Reconnects Can Trigger More Than a Name Change After a Long Vacancy
East Feliciana’s reconnect form distinguishes short outages from vacancies over six months and adds separate requirements for sewer, inspections, town approval and commercial use.
Ryan Pritchard
6 days ago2 min read


East Baton Rouge’s 2026 Site-Work Fees Belong in the Land Budget
East Baton Rouge updated subdivision-engineering fees in 2026. Driveways, drainage tie-ins, grading, ponds and flow studies can affect a site budget before construction.
Ryan Pritchard
6 days ago2 min read


Orange Beach Medical Center South Is Under Construction: What Nearby Property Users Should Track
Orange Beach has awarded a $1.4 million renovation contract for Medical Center South. Work began in October, with a nine-month target subject to construction conditions.
Ryan Pritchard
Nov 142 min read


Ascension’s West Bank Small Area Plan Is Adopted Guidance—Not a Parcel Entitlement
Ascension Parish’s adopted West Bank Small Area Plan guides future decisions, but buyers still need parcel-level zoning, access, utility and flood due diligence.
Ryan Pritchard
Nov 142 min read
bottom of page