East Feliciana Power Reconnects Can Trigger More Than a Name Change After a Long Vacancy

Ryan Pritchard
6 days ago
2 min read

A vacant house, camp, shop or commercial building may need more than a utility-company phone call before the lights come back on. East Feliciana Parish’s published name-change and reconnect form separates a short interruption from a property that has been without power for more than six months and asks for ownership, lease, sewer and town-approval information.


East Feliciana Parish Courthouse in Clinton Louisiana
East Feliciana Parish Courthouse in Clinton. Photo: Galen Parks Smith (Gsmith), CC BY-SA 3.0, via Wikimedia Commons.

The parish form uses the length of disconnection as a decision point


The form states that a meter with power on—or disconnected for less than six months—uses a $10-per-meter name-change or reconnect fee. It also says that when power has been disconnected for two weeks or longer, the sewer must be approved by the Health Unit before a meter is released.


For a disconnection longer than six months, the form lists a $125 charge and a required Certificate of Use inspection. These amounts come from the currently published form; buyers and agents should confirm the current fee and procedure before budgeting or promising a reconnect date.


Commercial property has a separate track


The same parish form lists a $100 Commercial Certificate of Use per meter and an electrical-safety inspection. It also warns that commercial properties need State Fire Marshal approval when the use or occupancy is changing. A former office, restaurant, retail space or shop should therefore be evaluated by proposed use—not only by whether a meter exists.


Inside town limits, the form says the meter will not be released until town approval is received. That creates an important jurisdiction check for property in Clinton, Jackson, Slaughter, Wilson or Norwood areas.


A vacancy-file checklist for buyers and sellers


  • Document when each electric meter was disconnected and whether the account is merely changing names.

  • Gather proof of ownership or the rental agreement required by the parish form.

  • Confirm sewer or septic approval before promising utility availability.

  • Ask whether a Certificate of Use and electrical-safety inspection are required.

  • For commercial property, disclose the former use and describe the buyer’s proposed use accurately.

  • Determine whether town approval is required in addition to parish review.


See Pritchard Real Estate’s East and West Feliciana area page for broader local context.


Official forms should lead the reconnect conversation


Review East Feliciana Parish’s name-change and reconnect application and the parish permit and inspection page. Utility providers, the Health Unit, the parish and the applicable town should confirm the current sequence.


If you are evaluating a vacant Feliciana home, camp, shop or commercial building, contact Ryan Pritchard or call 225-235-9509.